S.n Project Name Client Name Description ow the Works  Value of contract (NRs.) 
BRIDGE CONSTRUCTION WORKS    
1 Construction of Badighat Khola Bridge along Bhimgithhe Darling Road Baglung District Technical Office, Baglung Construction of Badighat Khola Bridge along Bhimgithhe Darling Road Baglung   58m long Prestress Bridge Box Girder Bridge with open foundation Contract No : LRBP-DDC-BAGLUNG/W/NCB-BADIGHAT/BRIDGE/-4-073-74   Starting Date : July 2017 Completed Date : June 2018 69,106,136.00
2 Construction of Damari Khola Pre stress Bridge along Dumkibas Kaltadi Deurali Road, Nawalparasi TID, Infrastructure development Office, Kawasoti, Nawalparasi Construction of Damari Khola Pre stress Bridge , Contract No : 08/LRBP/DDC/NAW/073-74   30 M SINGLE SPAN PRESTRESS BRIDGE Starting Date : Sep, 2017 Completed Date : Feb 2019 39,773,058.81
3 Construction of RCC Bridge over Bhusudi Khola Jhapa Hulakr Rajmarg Road Project Construction of RCC Bridge over Bhusudi Khola Jhapa 26.20m long Pile foundation Contract No : HRP-3372244/073-74-024 Starting Date : June 2017 Completed Date : Feb 2019   44,724,905.46
4 Construction of Bridge ( Superstructure work) of Rawa 2 Khola Bridge Local Roads Bridge Programme ( LRBP), Local Roads Bridge Support Unit, Manbhawan, Lalitpur Superstructure of memorable bridge of length 60.60 m with lane width 6 m of steel plate continuous girder type with  rcc deck slab Starting Date : Oct, 2017 Completed Date : Feb 2018 12,113,795.00
5 Construction of RCC T Beam Girdger Bridge District Technical Office , Salyan Construction RCC T Beam Girder Bridge with open foundation , Length 22X1 m Starting Date : July 2015 Completed Date : July 2018 19456466.000
6 Construction of Motorable Bridge work of steel plate grider with RCC Deck Local Roads Bridge Programme ( LRBP), Local Roads Bridge Support Unit, Manbhawan, Lalitpur Construction of Motorable Bridge work of steel plate grider with RCC Deck 40 M length Bridge E/w in excavation : 4295.24 cum RCC Work M 15/20 :38.74 cum, RCC Work M20/20 : 338.50 cum, RCC Work M25/20 : 93.01 cum, Steel Reinforecment  work : 30.79 Mt Random Rubble masonary : 937.25 cum Gabion works : 373.25 cum, Embankment filling works : 4533.72 cum & Sub base works 25 cum   Starting Date : August, 2014 Completed Date : April 2016 28,405,100.00
7 Construction of RCC Fixed Frame Bridge ( With Pile Foundation) at Manamaiju, kathmandu Office of District Development Committee, Kathmandu Cement Concret M30 : 336.20 cum Reinforcement : 47.20 Mt Random Rubble Masonary : 239.50 cum Form Works : 61.10 sqm Piling Works 520 Rm Earthwork excavation works : 972.40 cum Contract  Date : Falgun 2069 Completed Date : Ashad 2071 17,786,807.00
8 Trisuli Somdang Road Construction Project Trisuli Somdang Road Construction Project ( Royal Nepalese Army Head Quarter) , Tripureshwor, Kathmandu Construction of Balfore Betty Steel Bridge over Trisuli River and over Bhotekoshi River in Trisuli Somdang Road  
9 Kohalpur Makali Highway Project Nepal Construction Company Nepal Ltd Constructionof 3 Nos of RCC Bridges ( Dondawa 72 mt span, Gang 36 mt span, Bhada 66 mt span)  
Bench Development & Construction of Permanent Access Road to the Building in Phaksinda Complex, near Dam site of Arun 3 HEP ( PCD -75)
S.n Project Name Client Name Description ow the Works  Value of contract (NRs.) 
ROAD CONSTRUCTION WORKS    
1 Bench Development & Construction of Permanent Access Road to the Building in Phaksinda Complex, near Dam site of Arun 3 HEP ( PCD 75) SJVN Arun 3, Power Development Company Pvt Ltd Bench Development & Construction of Permanent Access Road to the Building in Phaksinda Complex, near Dam site of Arun HEP   Contract  Date : Feb 2017 Completed Date : July 2018 4,93,77,097.00
2 Blacktop Works in Libang urban Road, Rolpa Divison Road Office, Pyuthan Blacktop Road works Random Rubble Masonry : 262.93 cum Gabion works :48 cum Concrete M20/20 : 77.03 cum Reinforecment works : 3.36 Mt Base course : 237.82 cum Gravel sub base works : 368.84 cum Premix Carpeting : 46.83 cum Sand seal : 2341.25 sqm   63,69,212.16
3 Construction Road Works Saljhandi Sandhikharka Dhorpatan Road Project, Arghakhanchi Earthwork in excavation for roadway construction in all type soil 82,67,774.38
4 Construction of MRM Hetauda Pathlaiya Road, Drain works Division Office, Hetauda Drain works, RCC works Masonary Drain : 63.24 cum RCC Slab : 301.05 Cum Reinforcement works : 10.35 MT 49,14,574.20
5 Roadway Excavation Works along Lamidanda Kharpa Kubhinde Ainsalukharka Road , Khotang Division Road Office, Harkapur, OkhaldhungA Roadway Eccavation in all types of soil & rock : 14471.35 Cum 23,06,384.12
S.n Project Name Client Name Description ow the Works  Value of contract (NRs.) 
TRAFFICE SAFETY WORKS    
1 Road Safety works of Koshi Highway ( Ithari Dhankuta Section ) Department of Roads, Road Safety and Traffice Unit, Chakupat, Lalitpur Road Safety works of Koshi Highway ( Ithari Dhankuta Section )   Steel W Beam Crash Barrier : 1793.55 rm , Gabion safety Barrier, road paint etc 13,746,856.80
2 Traffic Safety Measure works along Khurkot ghurmi section Puspalal (Midhill ) Highway Project Directorate , Puspalal Mid Hill Highway Project, Dhulikhel , Kavre Traffic Safety Measure works along Khurkot ghurmi section W Beam Crash Barrier : 2226.25 m 10cm wide paint for road marking : 75108 rm Traffice sign & RCC Delinator post works 29,011,996.11
3 Road Safety works of Koshi Highway ( Ithari Dhankuta Section ) Department of Roads, Road Safety and Traffice Unit, Chakupat, Lalitpur Road Safety works on Charali Illam Section of Mechi Higheay   Steel W Beam Crash Barrier : 1793.55 rm , Gabion safety Barrier, road paint etc 13,079,608.80
S.n Project Name Client Name Description ow the Works  Value of contract (NRs.) 
BUILDING CONSTRUCTION WORKS    
1 Reconstruction work of Office/ Barrack Building Mess Toilte Block, Septi tank and soakpit works of Area Police Office Aeiselukharkha, Khotang Ministry of Home Affairs, No.1 State Police Office , Rani, Biratnagar   District Police Office, Khotang Stone Masonry : 287.74 Cum Cement Concrete : 238.83 Cum Form works : 1588.62 sqm Reinforcement works  : 31.34 Ton Plastering, Tiling works, Painting , Aluminium works, Sanitary & Electrification works   26,625,106.33
2 Construction of Healthpost Building , Gwalichaur, Baglung Department of Urban Development & Building Construction, Division Office, Baglung RR Masonary Works : 819.13 Cum PCC Work : 114.72 Cum RCC Works : 158.02 Cum Form Works : 1040.38 Sqm Reinforcement : 14617.36 kg Plastering works : 1933.18 sqm 2,03,85,726.40
3 Construction of Office Building of Sarkari Wakil Office Inaruwa, Sunsari District Attorney Office, Sunsari, Inaruwa Tel : 977-25-560179   Construction of Office Building of Sarkari Wakil Office Inaruwa, Sunsari     18,807,344.60
4 Construction of Singhdurbar Project Building Nepal Construction Company Nepal Ltd Reconstruction & Rectoffiting works of Singadurbar Project  4,173,639.00
5 Construction of Vocational Training Centre at Khokana ADRA, Nepal Construction of Vocational Training Centre at Khokana  
S.n Project Name Client Name Description ow the Works  Value of contract (NRs.) 
RIVER TRAINING WORKS    
1 River Training Works Water Induced Disaster Prevention Division Office No 7, Surkhet Supply of Boulder and filling in Gabion Crates : 1964.33 Cum, Gabion Supply : 12088 sqm, Earthw work : 474.69 55,00,438.37
2 River Training Works Water Induced Disaster Prevention Division Office No 7, Surkhet Supply of Boulder and filling in Gabion Crates : 2121.575 Cum, Gabion Supply : 13242 sqm, Earthw work : 511.466 57,73,218.46